A crew is connecting on the 12th story. The uppermost permanent floor is the 2nd story, unfinished bolting extends 5 floors above the 2nd, and the nearest fully decked floor is 3 stories below the connectors. Which Subpart R multi-story limit is already exceeded (assuming no design exception)?
Correct Answer:
The eight-story gap between the erection floor and the uppermost permanent floor