Question 1
Interlocking signals are also called which term?
Correct Answer:
Home signals
Explanation:
Interlocking signals are the signals that control entry to a block and are protected by the signal interlocking to prevent conflicting movements. The signal that governs entry to the block—the one the train driver sees first at the entrance—is called the home signal. In interlocking systems, the home signal is the primary indicator linked to the route set by the interlocking, showing stop or proceed only when the route is safe. That’s why the term home signal fits as the label for interlocking signals in this context. The other terms don’t capture that specific role: fixed signals aren’t part of an interlocking, and trackside signals is a generic label, while interlocking signals is a broader phrase rather than the commonly used term for this entry signal.
Question 2
What is a Signal, Block?
Correct Answer:
A fixed signal at the entrance of a block that governs trains entering and using that block. NOTE: Block signals are also called 'intermediate' signals.
Explanation:
A block signal is a fixed device placed at the entrance to a defined section of track (a block) that tells a train whether it may enter and proceed through that block. It governs entry and how the block will be used, so trains don’t collide by occupying the same block at the same time. In many systems these signals are also called intermediate signals. This is the best description because it reflects that the signal is a stationary, trackside authority at the start of a block, controlling entry into that block and the movement within it. The other options describe concepts that aren’t block signals: a moving signal on the locomotive isn’t how a block signal is defined; a flagger’s hand signal is a human communication method used in certain operations, not the fixed block signal; and a float in a water block is unrelated to railway signaling.
Question 3
What is the operator's primary responsibility before starting a TRAX trip?
Correct Answer:
Ensure the train is in safe condition, verify route, check that doors, brakes, signaling, and communication systems are functioning, and review any special instructions.
Explanation:
Before starting a TRAX trip, the operator must perform a thorough pre-departure safety check to confirm the train is safe and ready to operate. This means ensuring the train is in safe condition and that the route is verified, while also checking that critical systems are functioning. Specifically, doors, brakes, signaling, and communication systems should be operating properly, and any special instructions for that trip—such as work zones, temporary speed limits, or alternative procedures—should be reviewed. This approach protects riders and staff by confirming the vehicle can be controlled, stopped, and communicated with dispatch, and that the driver is aware of any conditions that could affect the trip. Starting without these checks is unsafe. Merely verifying the route and special instructions misses essential safety checks, and while asking passengers about issues is useful, it doesn’t replace the required pre-trip inspections.
Question 4
Which term describes a device used to lock the position of a switch to prevent unauthorized changes?
Correct Answer:
Electric Switch Lock
Explanation:
Locking a switch to prevent unauthorized changes is about using a device that physically secures the switch in its current position. An Electric Switch Lock is exactly that kind of device: a lockable mechanism that fits the switch lever or handle so it can’t move until an authorized person removes the lock. This is a common safety measure during maintenance or operations to ensure the switch stays in the required position, preventing unintended changes that could affect train routing or safety. The other terms don’t describe a locking device: false occupancy deals with incorrect indications of track occupancy, dwell time is the period a train spends stopped at a location, and energize simply means applying power to a circuit.
Question 5
A safety warning method used to indicate that traction power substations or other equipment have been de-energized for maintenance is called what?
Correct Answer:
Red Tag
Explanation:
In safety practices, when maintenance is done on traction power equipment, a tag-out system is used to clearly indicate the equipment is de-energized and must not be operated. The specific method involves placing a red tag on the equipment (often with the maintainer’s name and the reason) to warn others not to re-energize it until the tag is removed by an authorized person after proper verification. This makes the status visible to all workers and helps prevent accidental energizing during maintenance. The other options don’t fit this purpose: a panic brake is related to emergency stopping, a route selector is about choosing train routes, and right-of-way refers to the track area; none describe the warning method used to mark de-energized equipment.
Question 1
Exam overview

About this Exam

Prepare with the UTA TRAX Light Rail Practice Test practice quiz. This question bank includes 10 questions covering term, signal, called, describes, and device. Use it to review important concepts, identify knowledge gaps, and build confidence for the related exam, course, or assessment.

More details

Additional Information

UTA TRAX Light Rail Practice Test

This practice set contains 10 questions from the matching question bank and focuses on term, signal, called, describes, and device. Work through each question carefully, review the provided solutions, and revisit topics that need more study before your next attempt.

This is an independent study resource intended for practice and review; it is not an official examination or an endorsement by any organization named in the title.

Quiz information

Frequently Asked Questions

The complete question count is available after full access is unlocked.
No fixed duration is currently configured for this quiz.
Question explanations are included where they are available in the quiz content, helping you review the reasoning after answering.
Yes. You can retake the practice test again as you continue studying during your available access period.
After your access is confirmed, you can continue into the complete practice exam from this quiz flow.
Unless explicitly stated otherwise, this page provides independent practice material for study and exam preparation and is not the official examination itself.
Keep studying

Related Questions