Question 1
In the phrase 'to Jones for the life of Brown and then to Smith in fee simple', which estate is created for Jones?
Correct Answer:
Estate per Autrie Vie
Explanation:
The main idea here is a life estate measured by another person’s life. When you say “to Jones for the life of Brown,” Jones holds a life estate, but its duration is Brown’s life, not Jones’s. Because the measuring life is Brown, this is a life estate pur autre vie—Jones’s ownership lasts only until Brown dies, even if Jones lives longer. The clause that follows, “and then to Smith in fee simple,” creates a future interest for Smith that takes effect after Brown’s death, but it doesn’t change the nature of Jones’s present estate. So Jones has a life estate pur autre vie.
Question 2
A key objective in seismic design is to:
Correct Answer:
Limit earthquake-induced forces and ensure energy dissipation to protect occupants
Explanation:
In seismic design, the aim is to limit the forces that an earthquake transmission can impose on a structure and to provide mechanisms for dissipating that energy through controlled, ductile deformation. The goal is not to stop all movement or stay perfectly rigid, but to allow movement in a way that reduces peak demands and prevents collapse. When a structure can yield and absorb energy safely, occupants remain protected and the building can endure shaking without catastrophic failure. Excessive stiffness tends to transfer large forces and can lead to brittle damage, while trying to prevent any deformation is unrealistic—some movement is necessary to absorb energy. Eliminating the foundation ignores the fundamental role foundations play in loading and energy transfer. By focusing on limiting earthquake-induced forces and ensuring energy dissipation, designers achieve safer performance and life-safety outcomes under seismic events.
Question 3
Under the Torrens Title System, ownership is evidenced by registration with which body?
Correct Answer:
Land court
Explanation:
In the Torrens title system, ownership is proved by a government land register. When the title is registered with the Land Court, a certificate of title is issued that serves as definitive evidence of who owns the property. This concept, known as indefeasibility of title, means the registered owner is protected from challenges based on prior deeds, aside from limited exceptions like fraud. Transfers occur by updating the registration, not by tracing a chain of deeds. The other bodies mentioned don’t provide this definitive title evidence in Torrens systems, so the body that records and confirms ownership is the Land Court.
Question 4
For a simply supported beam with a center point load P, what is the maximum bending moment?
Correct Answer:
P*L/4
Explanation:
When a simply supported beam carries a single point load at midspan, the supports share the load equally, so each reaction is P/2. Between the left support and the center, the shear is constant at P/2, so the bending moment increases linearly from zero at the left end. The moment at a distance x from the left support is M(x) = (P/2) x. At the center, where x = L/2, the maximum moment is Mmax = (P/2) · (L/2) = P L / 4. The moment then decreases symmetrically to zero at the right support. Thus, the maximum bending moment is P L / 4.
Question 5
Which option is NOT a recognized code for structural material design?
Correct Answer:
OSHA
Explanation:
Understanding structural design codes involves recognizing which organizations publish rules for material behavior and member sizing. ACI provides the concrete design code used to ensure safe concrete structures. AISC offers the steel design provisions for steel members and connections. NDS gives the wood design specification for timber. OSHA, however, sets safety and health regulations for workplaces, not the design rules governing structural materials. So OSHA is not a recognized code for structural material design.
Question 1
Exam overview

About this Exam

The Principles and Practice of Surveying (PS) exam is a foundational milestone for ambitious professionals striving to become licensed Professional Land Surveyors.


This computer-based examination, meticulously developed by the National Council of Examiners for Engineering and Surveying (NCEES), represents the gold standard for measuring professional competency in the geomatics and surveying fields.


It is designed for surveyors who have already achieved a mandatory level of prerequisite education and, crucial to the licensing process, have gained four years of progressive professional experience under the mentorship of a licensed surveyor.


Successfully passing the PS exam is not just an academic achievement; it is a legal requirement in most jurisdictions to protect the health, safety, and welfare of the public by ensuring high standards in land surveying practices.


Licensure through this exam signifies that you have the knowledge and judgment required to take responsibility for crucial land and boundary determinations

More details

Additional Information

What the Course Entails and Exam Details

A comprehensive study guide for the PS exam does not follow a simple "course" but rather a rigorous professional syllabus covering several specialized domains essential to modern surveying.

The specifications for the PS exam are broad and technical, ensuring that you understand both the legal principles and the standard technical specifications that govern the profession.

Key areas of focus in your preparation must include Legal Principles, which comprises boundary law, land title analysis, legal descriptions, and the rules of evidence that are fundamental to determining property lines.

You must also master Professional Survey Practices, which encompasses measurement standards, control network design, total station and GNSS applications, and data adjustment methods.

Furthermore, the syllabus includes Standards and Specifications, specifically related to ALTA/NSPS standards, federal and state laws, and cadastral surveying protocols.

Finally, you will be evaluated on Business Practices, which covers professional ethics, contracts, risk management, and the management of a surveying office, alongside specialized technical areas like Geodetic Surveying, Hydrographic Surveying, and Geographic Information Systems (GIS).

 

 

What to Expect in the Final Exam

The final NCEES PS exam is a daunting, closed-book, seven-hour computer-based test (CBT) that demands mental stamina and focused accuracy.

The exam consists of 100 multiple-choice questions, which may include both traditional single-choice questions and alternative item types (AITs), such as point-and-click, drag-and-drop, or fill-in-the-blank scenarios.

While the total appointment time at the testing center is seven hours, this includes a non-disclosure agreement tutorial and a scheduled 50-minute break.

The actual time allotted to solve the examination questions is exactly six hours.

You are strictly prohibited from bringing outside reference materials into the testing room; instead, an electronic NCEES PS Reference Handbook will be provided on your computer screen during the exam.

We strongly advise you to download this handbook for free from your MyNCEES account early in your study process to familiarize yourself with its navigation and content.

A strictly enforced calculator policy permits only specific approved models, such as particular scientific models from Casio, HP, and Texas Instruments, which you must bring with you.

The exam results are reported strictly on a pass/fail basis, as NCEES does not publish the specific raw or scaled score required to pass.

 

 

How to Study and Exam Centers

Your path to success on the PS exam depends on moving beyond passive review and adopting a strategy of active, rigorous problem-solving.

The most valuable study tool available is the official NCEES PS Practice Exam, which is written by the actual exam developers and contains questions from past exams, providing a realistic simulation of the format, style, and difficulty you will face.

Begin your studies months in advance by thoroughly reading the PS Reference Handbook from cover to cover and integrating it into your daily practice problems.

The single most effective strategy is to solve as many practice problems as possible from reliable prep bundles, forcing yourself to rely only on the handbook and an approved calculator, just as you will in the real test environment.

You must dedicate time to full-length timed simulation runs using a NCEES PS Practice Exam to build the essential endurance required for the six-hour testing period.

Once you have completed your preparations, you must register for the exam through your personalized MyNCEES account.

The exam is administered year-round by Pearson VUE, the authorized NCEES testing partner, at hundreds of physical, high-security testing centers across North America.

We encourage you to schedule your appointment several months in advance, especially if you have a preferred testing window, as seats at these professional test centers fill quickly.

 

 

 Job Opportunities from the Course

Earning your Professional Land Surveyor licensure after passing the PS exam opens the door to high-ranking leadership positions and significantly increases your career trajectory.

This elite credential grants you the legal authority to sign, seal, and certify legal surveying documents, a mandatory requirement for submitting subdivision plats, ALTA surveys, and legal boundary determinations.

You will become qualified for prestigious roles such as a licensed Professional Land Surveyor (PLS) or a Geomatics Engineer for private firms, utilities, and governmental agencies.

Many licensed surveyors advance to positions of seniority as a Boundary Surveyor, assessing complex land titles and expert witness cases.

You may also find rewarding, high-impact career paths as a Construction Surveyor, managing large-scale infrastructure projects, or as a GIS Analyst, leveraging geospatial data.

Furthermore, this licensure provides the ultimate career path of entrepreneurship, enabling you to establish and operate your own independent surveying consultancy or land-planning firm.

Quiz information

Frequently Asked Questions

The complete question count is available after full access is unlocked.
No fixed duration is currently configured for this quiz.
Question explanations are included where they are available in the quiz content, helping you review the reasoning after answering.
Yes. You can retake the practice test again as you continue studying during your available access period.
After your access is confirmed, you can continue into the complete practice exam from this quiz flow.
Unless explicitly stated otherwise, this page provides independent practice material for study and exam preparation and is not the official examination itself.
Keep studying

Related Questions