Question 1
Who determines the survey party and its components for a Geodetic Control Survey?
Correct Answer:
The Chief of Party or the Project Contractor
Explanation:
The person who actually sets up the field crew for a geodetic control survey is the on-site lead—the Chief of Party—often acting for the Project Contractor when the work is contracted. This role is responsible for organizing the survey party, deciding its size and the specific positions (such as field crew roles and qualifications) based on the project’s scope, required accuracy, safety, and practical logistics. If a contractor is involved, they may propose the staffing plan, but it remains under the Chief of Party’s supervision to ensure it meets contract terms and technical standards. Higher-level offices like NAMRIA, regional executives, or departmental administrators oversee policy, funding, or program direction, not the day-to-day configuration of the survey team.
Question 2
Which cadastral survey involves bearings and distances computed based on actual ground survey?
Correct Answer:
Numerical Cadastre
Explanation:
The test here is about how parcel boundaries are defined in a cadastral survey. When bearings and distances are computed from actual ground survey, the boundaries are described numerically in a coordinate system, with the corner positions determined through field measurements and then stored as coordinates. This approach is the essence of numerical cadastre: it uses computed, numeric coordinates rather than just a plotted graphic on a map. Graphical cadastre emphasizes the drawn plan based on field measurements, often focusing on the map representation rather than the numeric coordinates. Control surveys deal with establishing and maintaining a framework of reference points for surveys, not specifically delineating parcels. A cadastre, in general, is the system of records for land parcels, but the description of coordinates derived from ground measurements specifically identifies numerical cadastre.
Question 3
Under RA 8560, who must be authorized to conduct a Geodetic Control Survey?
Correct Answer:
A qualified professional as per RA 8560
Explanation:
Geodetic Control Survey must be conducted only by a professional who is qualified under RA 8560. This Act defines who is authorized to practice geodetic engineering and sets the specific qualifications that allow someone to perform control surveys, ensuring high precision, standardized procedures, and accountability. It isn’t enough to hold a general engineering license or years of experience in another field; only those who meet the RA 8560 qualifications and are officially authorized to practice geodetic engineering may perform these surveys. This safeguards the accuracy and reliability of the geodetic control network on which maps, land titles, and infrastructure projects rely.
Question 4
What is the standard generic term for satellite navigation systems that provide autonomous geo-spatial positioning with global coverage?
Correct Answer:
GNSS
Explanation:
The concept being tested is recognizing the umbrella term for satellite-based positioning systems that work globally and operate autonomously. GNSS, Global Navigation Satellite System, is the standard generic term because it encompasses all constellations that provide worldwide, independent positioning—GPS, GLONASS, Galileo, BeiDou, and others—under one umbrella. GPS is just one specific system within GNSS, not the general term. GIS refers to Geographic Information Systems, which handle mapping and data analysis, not satellite positioning. SIS isn’t a standard term for these systems. So GNSS best fits as the broad, globally covering, autonomous positioning reference.
Question 5
What is the bottom cross-section dimension of the second order of accuracy?
Correct Answer:
40 x 40
Explanation:
Second-order accuracy means the numerical error decreases roughly with the square of the grid spacing (h^2) as you refine the mesh. To observe and achieve that level of accuracy on the bottom cross-section, you need a mesh fine enough that the h^2 terms dominate the error behavior. Among the options, the configuration with the most grid points per dimension provides the smallest spacing, giving the best chance to realize second-order accuracy. The coarser grids produce larger spacing and larger truncation errors, which typically do not demonstrate the second-order behavior. Therefore, the bottom cross-section dimension that supports second-order accuracy is the finer 40 x 40 configuration.
Question 1
Exam overview

About this Exam

Prepare with the DMC Department Administrative Order (DAO) No. 2007-29 Practice Test practice quiz. This question bank includes 10 questions covering survey, control, geodetic, ground, and term. Use it to review important concepts, identify knowledge gaps, and build confidence for the related exam, course, or assessment.

More details

Additional Information

DMC Department Administrative Order (DAO) No. 2007-29 Practice Test

This practice set contains 10 questions from the matching question bank and focuses on survey, control, geodetic, ground, and term. Work through each question carefully, review the provided solutions, and revisit topics that need more study before your next attempt.

This is an independent study resource intended for practice and review; it is not an official examination or an endorsement by any organization named in the title.

Quiz information

Frequently Asked Questions

The complete question count is available after full access is unlocked.
No fixed duration is currently configured for this quiz.
Question explanations are included where they are available in the quiz content, helping you review the reasoning after answering.
Yes. You can retake the practice test again as you continue studying during your available access period.
After your access is confirmed, you can continue into the complete practice exam from this quiz flow.
Unless explicitly stated otherwise, this page provides independent practice material for study and exam preparation and is not the official examination itself.
Keep studying

Related Questions