Question 1
Which plugin is installed with FSM along with the Planned Maintenance plugin?
Correct Answer:
Planned Maintenance (com.snc.planned_maintenance)
Explanation:
In ServiceNow, certain products come with companion plugins that extend their capabilities. When FSM (Field Service Management) is installed in Paris, it includes the Planned Maintenance functionality as a built-in companion, identified by the plugin ID com.snc.planned_maintenance. This is the exact plugin that enables the planned maintenance features that work hand-in-hand with FSM, such as planning maintenance tasks, linking them to assets, and coordinating with field work orders. That’s why the listed Planned Maintenance option is the correct choice: it’s the plugin that ships with FSM to support those capabilities. The other plugin IDs refer to different components—one is the core FSM plugin itself, while the others point to separate maintenance-related extensions or utilities that aren’t the default companion provided with FSM.
Question 2
What happens when a task route cannot be optimized?
Correct Answer:
Task route cannot be optimized
Explanation:
When the optimization engine can’t find a feasible improvement, it can’t produce a better route for the tasks. In such a case, the system leaves the current route as is and doesn’t push a new, optimized plan. That’s why the outcome described is that the task route cannot be optimized—the route remains unchanged because no better arrangement could be found within the given constraints. The other options imply actions that only occur if optimization succeeds or if an intervention is triggered separately (like a manual assignment or cancellation). Recalculating and dispatching would be a result of a successful optimization, manual assignment isn’t automatic just because optimization isn’t possible, and cancellation is not the standard response to an unoptimizable route.
Question 3
What does Maturity Level 1 - Modernize focus on?
Correct Answer:
Improve Field Agent task Mgmt, Geolocation, Automate scheduling
Explanation:
Maturity Level 1 - Modernize focuses on strengthening the way field work is executed on the ground. It aims to make field operations more efficient by improving how tasks are managed for field agents, using geolocation to better track and assign work, and automating scheduling to reduce delays and optimize who does what and when. This foundational shift is about making everyday field activities smoother and more reliable. That’s why improving Field Agent task management, geolocation, and automated scheduling best fits Level 1 Modernize. The other options point to capabilities more aligned with higher maturity stages or unrelated areas: trend analysis and IoT automation imply advanced analytics and device integration; Transform refers to a later maturity level; and the option about “Company” doesn’t describe a focused field-service capability.
Question 4
To configure work orders and work order tasks to use the task skills, which table should be configured?
Correct Answer:
Task Skills (task_m2m_skill) table
Explanation:
The key idea is the per-task association of skills through a dedicated mapping between tasks and skills. The Task Skills (task_m2m_skill) table is a many-to-many bridge that links each task (including work order tasks) to the Skill records. This is what lets you declare exactly which skills are required for a given task and, if supported, the level of proficiency needed. With this mapping, both a work order and its tasks can use the same task-skill definitions for skill-based assignment and validation. If skills were attached only at the work order level, you’d lose per-task granularity, since different tasks on the same work order can require different skills. The Skill Matrix table handles broader cross-skill relationships rather than the direct task-to-skill link. The Task Skill Levels table stores level values for a task-skill pair but relies on the existence of the task-skill association itself.
Question 5
Which solution is used when importing problematic data to transform the source rather than scripts?
Correct Answer:
Source Transformation
Explanation:
Transforming data at import time is the approach used when the incoming data is inconsistent or needs normalization. Source Transformation lets you apply rules to the incoming data in the Import Set’s Transform Map, transforming the source values before they are mapped to the target fields. This is ideal for problematic data because you can standardize formats, clean up typos, convert date formats, map aliases, or derive correct values without writing scripts. The result is data that already fits the target schema as it enters the system, reducing the need for post-import fixes. The alternative of Fix Scripts would require writing custom code to adjust data during the transform, which is more maintenance-heavy. The other options relate to FSM workflows or case handling and aren’t about transforming data during import.
Question 1
Exam overview

About this Exam

Prepare with the ServiceNow Field Service Management (FSM) – Paris Practice Test practice quiz. This question bank includes 10 questions covering plugin, task, order, work, and stockroom. Use it to review important concepts, identify knowledge gaps, and build confidence for the related exam, course, or assessment.

More details

Additional Information

ServiceNow Field Service Management (FSM) – Paris Practice Test

This practice set contains 10 questions from the matching question bank and focuses on plugin, task, order, work, and stockroom. Work through each question carefully, review the provided solutions, and revisit topics that need more study before your next attempt.

This is an independent study resource intended for practice and review; it is not an official examination or an endorsement by any organization named in the title.

Quiz information

Frequently Asked Questions

The complete question count is available after full access is unlocked.
No fixed duration is currently configured for this quiz.
Question explanations are included where they are available in the quiz content, helping you review the reasoning after answering.
Yes. You can retake the practice test again as you continue studying during your available access period.
After your access is confirmed, you can continue into the complete practice exam from this quiz flow.
Unless explicitly stated otherwise, this page provides independent practice material for study and exam preparation and is not the official examination itself.
Keep studying

Related Questions