Question 1
What is shown in the Team Sprint Demo?
Correct Answer:
Every story, Spike, Refactor, NFR
Explanation:
The Team Sprint Demo is about showing the complete increment produced in the sprint. It should display the working, integrated result of all completed work, which includes every story, any spikes, refactors, and nonfunctional requirements that were finished during the sprint. The point is to present a potentially releasable product increment to stakeholders and gather feedback, not to review the budget or risk registers. UI changes are part of the demo only to the extent they’re included in the finished work, but the focus is on demonstrating all completed items from the sprint.
Question 2
Which of the following is NOT part of the I&A three parts?
Correct Answer:
Problem solving workshop
Explanation:
Inspect and Adapt at the end of a Program Increment brings together three activities: a System Demo that shows the integrated solution to stakeholders, quantitative measurement that provides data on how the system is performing, and a Problem-Solving Workshop to address the largest gaps and root causes found. The sprint retrospective belongs to the team level and happens within each iteration to improve the team’s own process, not the ART-wide I&A agenda. So the item that is not part of the I&A three parts is the sprint retrospective. The other options align with I&A: the System Demo (often referred to as the PI/system demo), the quantitative measurements, and the problem-solving workshop.
Question 3
How often is the team demo conducted in the ART?
Correct Answer:
Every two weeks
Explanation:
This item tests how often the Team Demo happens within an Agile Release Train. In SAFe, teams on an ART work in fixed iterations, typically two weeks long. At the end of each iteration, the team holds a Team Demo to show the completed, integrated increment to stakeholders. This cadence keeps feedback fast and alignment across the train. Since the standard iteration length is two weeks, the Team Demo occurs every two weeks. While some organizations might refer to iterations as sprints, the key idea is the two-week rhythm, which is why every two weeks is the best fit.
Question 4
Why start CoD component estimates with a baseline value of 1?
Correct Answer:
To anchor estimates and enable relative sizing
Explanation:
In WSJF, the Cost of Delay components are tied to a common reference unit so you can compare items quickly and fairly. Starting each CoD component at a baseline of 1 anchors the scale, making the numbers purely relative rather than tied to absolute dollars or hours. When you rate components like business value, time criticality, and risk reduction, a score of 3 means three times the baseline value, and you get a simple sum for the CoD (for example, 3 + 2 + 1 = 6). This keeps the Cost of Delay a clear, interpretable relative measure that, when divided by the job size, yields a consistent, comparable WSJF value across backlog items. It also prevents zeros and keeps the math straightforward, which supports consistent decision-making.
Question 5
What is emergent design?
Correct Answer:
Teams grow the system design as user stories require
Explanation:
Emergent design means the system’s architecture and design grow and adapt as work unfolds, rather than being fully specified before development begins. As teams implement features and learn what works, they make design decisions to fit current needs and continuously refactor to keep the design clean and scalable. This approach keeps the architecture flexible and responsive to changing requirements, with the architectural runway providing just enough guidance to support near-term work while allowing future evolution. The best expression of this idea is that teams grow the system design as user stories require. Upfront, fixed design contradicts agile practice, and having external consultants dictate architecture or repeatedly overhaul the design each sprint ignores team ownership and continuous learning.
Question 1
Exam overview

About this Exam

Prepare with the SAFe Scaled Agile For Enterprise Certification Practice Exam practice quiz. This question bank includes 10 questions covering team, sprint, demo, safe, and scaled. Use it to review important concepts, identify knowledge gaps, and build confidence for the related exam, course, or assessment.

More details

Additional Information

SAFe Scaled Agile For Enterprise Certification Practice Exam

This practice set contains 10 questions from the matching question bank and focuses on team, sprint, demo, safe, and scaled. Work through each question carefully, review the provided solutions, and revisit topics that need more study before your next attempt.

This is an independent study resource intended for practice and review; it is not an official examination or an endorsement by any organization named in the title.

Quiz information

Frequently Asked Questions

The complete question count is available after full access is unlocked.
No fixed duration is currently configured for this quiz.
Question explanations are included where they are available in the quiz content, helping you review the reasoning after answering.
Yes. You can retake the practice test again as you continue studying during your available access period.
After your access is confirmed, you can continue into the complete practice exam from this quiz flow.
Unless explicitly stated otherwise, this page provides independent practice material for study and exam preparation and is not the official examination itself.
Keep studying

Related Questions