Question 1
Which component of a static-line parachute system helps initiate deployment?
Correct Answer:
Pilot chute.
Explanation:
The pilot chute is the element that starts the deployment in a static-line system. When the jumper exits, the static line pulls the pilot chute out of its pack. Once inflated, the pilot chute creates the drag needed to pull the main deployment bag and its lines out of the container, initiating the full canopy deployment. The other parts play different roles—closing loop simply links the static line to the system, risers connect the canopy to the harness, and gores are the fabric panels that form the canopy—but none of them start the deployment the way the pilot chute does.
Question 2
When sewing a reinforcement patch, what is the purpose of baste work if needed?
Correct Answer:
To temporarily hold the patch in place.
Explanation:
Temporary holding before final stitching is the purpose of baste work when attaching a reinforcement patch. Baste stitches are long, easily removable stitches that keep the patch in the exact position during sewing, especially on curved or bulky areas. They prevent shifting as you work and help with alignment, so the final seam sits correctly. After the permanent stitches are in place, the baste stitches are removed. It isn’t meant to permanently secure the patch, nor to resize it, nor as the primary method of marking alignment.
Question 3
Which factors influence the decision to repair versus replace a damaged patch?
Correct Answer:
Size, location, fabric condition, load path impact, and available approved repair methods.
Explanation:
The key idea is to assess whether a patch can restore the required strength and reliability without compromising the parachute’s load paths, using only approved methods. The size and location of the damage determine if the patch can cover it without creating stress concentrations or interfering with reinforcements. The fabric condition around the damage matters too; if the surrounding material is worn or delaminated, a patch won’t fix the underlying problem and replacement may be needed. How the patch affects the load path is central—the repair must maintain or reproduce the intended transfer of loads through the fabric, seams, and reinforcements, not weaken them. Finally, only approved repair methods may be used; if there isn’t an approved method for that damage type or location, the repair isn’t permitted and replacement becomes necessary. Cosmetic factors like patch color or thread type don’t influence structural safety. Time of day or weather during the repair isn’t part of the decision, though safe working conditions are always important. Cost or availability of replacement patches can affect scheduling, but they don’t override the engineering and regulatory criteria for whether a repair is SAMPLEallowable.
Question 4
In a galvanic couple, the material that corrodes less readily is called the what?
Correct Answer:
Cathode
Explanation:
In a galvanic couple, two dissimilar metals in an electrolyte form an electrochemical cell where electrons flow from the more active metal to the less active one. The more active metal loses electrons and oxidizes, becoming the anode and corroding. The less active metal accepts electrons and undergoes reduction, acting as the cathode and being protected from corrosion. Because corrosion is driven by oxidation, the metal that corrodes less readily is the cathode. For example, zinc will corrode as the anode when paired with copper, while copper serves as the cathode and remains comparatively protected. The other terms describe forms of corrosion rather than the role of an electrode in the galvanic couple.
Question 5
What is the form number for VIDS/MAF?
Correct Answer:
OPNAV 4790/60
Explanation:
NAV maintenance records use the OPNAV 4790 series, with specific form numbers assigned to each document. The Visual Inspection Data Sheet / Maintenance Action Form (VIDS/MAF) is designated on the official schedule as OPNAV 4790/60. This form is the standard record for capturing inspection results and the maintenance actions that follow, ensuring a traceable history for the equipment. The other numbers belong to different maintenance documents and are not used for VIDS/MAF, so they wouldn’t be the correct reference for this form.
Question 1
Exam overview

About this Exam

Prepare with the Navy Parachute Rigger (PR) Introduction and Sewing Practice Test practice quiz. This question bank includes 10 questions covering parachute, patch, component, navy, and rigger. Use it to review important concepts, identify knowledge gaps, and build confidence for the related exam, course, or assessment.

More details

Additional Information

Navy Parachute Rigger (PR) Introduction and Sewing Practice Test

This practice set contains 10 questions from the matching question bank and focuses on parachute, patch, component, navy, and rigger. Work through each question carefully, review the provided solutions, and revisit topics that need more study before your next attempt.

This is an independent study resource intended for practice and review; it is not an official examination or an endorsement by any organization named in the title.

Quiz information

Frequently Asked Questions

The complete question count is available after full access is unlocked.
No fixed duration is currently configured for this quiz.
Question explanations are included where they are available in the quiz content, helping you review the reasoning after answering.
Yes. You can retake the practice test again as you continue studying during your available access period.
After your access is confirmed, you can continue into the complete practice exam from this quiz flow.
Unless explicitly stated otherwise, this page provides independent practice material for study and exam preparation and is not the official examination itself.
Keep studying

Related Questions