Question 1
Gypsum lath is usually supplied with how many sheets per bundle?
Correct Answer:
6
Explanation:
Gypsum lath is packaged in bundles sized for a balance of weight and progress on the job. The standard bundle contains six sheets, typically 4 by 8 feet each. This size is easy to handle and transport, yet provides enough material to keep plastering tasks moving without constant reloading. Fours would require more bundles and extra handling, while eight or more sheets become heavy and cumbersome, especially on smaller jobs. So, six sheets per bundle is the usual, practical standard.
Question 2
Which statement about prefabricated non-load-bearing studs is true?
Correct Answer:
All of the above
Explanation:
Prefabricated non-load-bearing studs come in different web designs and cross-sectional shapes to suit interior partition needs. They may have solid webs, which provide a uniform, sturdy nail and screw surface. They may have perforated webs, which reduce weight and make it easier to route electrical cables or other services through the wall cavity. They may be produced in more than one shape, offering various profiles to match different framing and attachment requirements. Because of these variations, all of these features can be found in prefabricated non-load-bearing studs.
Question 3
What is the minimum end lap distance for metal lath?
Correct Answer:
1 foot
Explanation:
End laps in metal lath are overlaps where one piece extends over the end of the next, creating a continuous, anchored skeleton for the plaster. The overlap distance must be enough to hold the lath firmly in place and to transfer the plaster load evenly across joints, preventing gaps, tearing, or movement as plaster is applied and as the wall experiences movement with drying, curing, or temperature changes. The minimum end lap distance for metal lath is one foot. That amount provides sufficient surface area for the lath to grip the adjacent sheet and for the plaster to bond across the joint, reducing the risk of cracking or loosening at the lap. Shorter overlaps—such as six inches or three inches—can allow gaps or pull-out under plastering stresses, while a two-foot overlap is more than necessary for standard practice.
Question 4
Lead-backed lath has sheets of lead laminated on which side to block X-ray transmission?
Correct Answer:
On one side to block X-ray transmission
Explanation:
Lead acts as a radiation shield, so lead-backed lath is laminated on one side to place the shielding directly in the path of the X-ray beam toward the protected space. This single-sided backing provides the necessary attenuation while keeping weight and cost reasonable. Adding lead to both sides adds unnecessary weight and expense, and placing it in the middle wouldn’t position the shield effectively in the beam path. Not using any lead would fail to block X-ray transmission.
Question 5
Which PPE is essential for plastering work?
Correct Answer:
Eye protection, gloves, dust mask or respirator, hearing protection where needed, protective clothing; fall protection when working at height
Explanation:
Plastering work creates several hazards at once—wet material can splatter, dust from dry plaster can irritate the lungs, tools can injure eyes or skin, and working on scaffolds or ladders brings a fall risk. The best protection is a full set of personal protective equipment that covers these risks: eye protection to guard against splashes and dust, gloves to protect hands from caustic materials and rough textures, a dust mask or respirator to filter particulates, hearing protection where noisy tools are used, protective clothing to keep skin and clothes clean and resist splashes, and fall protection when working at height. Sunscreen alone won’t address these hazards, and opting for no PPE or only one item (like safety shoes) leaves many risks unprotected. This comprehensive approach keeps eyes, skin, lungs, ears, and bodies safe on plastering jobs.
Question 1
Exam overview

About this Exam

Prepare with the California Lathing and Plastering Contractor (C-35 License) Practice Exam practice quiz. This question bank includes 10 questions covering lath, gypsum, sheets, minimum, and distance. Use it to review important concepts, identify knowledge gaps, and build confidence for the related exam, course, or assessment.

More details

Additional Information

California Lathing and Plastering Contractor (C-35 License) Practice Exam

This practice set contains 10 questions from the matching question bank and focuses on lath, gypsum, sheets, minimum, and distance. Work through each question carefully, review the provided solutions, and revisit topics that need more study before your next attempt.

This is an independent study resource intended for practice and review; it is not an official examination or an endorsement by any organization named in the title.

Quiz information

Frequently Asked Questions

The complete question count is available after full access is unlocked.
No fixed duration is currently configured for this quiz.
Question explanations are included where they are available in the quiz content, helping you review the reasoning after answering.
Yes. You can retake the practice test again as you continue studying during your available access period.
After your access is confirmed, you can continue into the complete practice exam from this quiz flow.
Unless explicitly stated otherwise, this page provides independent practice material for study and exam preparation and is not the official examination itself.
Keep studying

Related Questions