Question 1
Which system uses electronic tags to store data about items and allows data retrieval without close proximity or line of sight?
Correct Answer:
Radio frequency identification tag (RFID)
Explanation:
The main idea is identifying and tracking items with electronic tags that can be read without direct sight or close proximity. Electronic tagging stored on the item lets a reader pull data via radio waves, so you don’t need to scan the tag visually or be right next to it. This is RFID, which can read tags through packaging or at a distance, using a reader and antenna to retrieve the stored information. RFID tags can be passive (no internal power, activated by the reader) or active (powered tag with its own battery), and they enable real-time inventory visibility and faster data capture in many operations. Other options don’t fit this concept: random-location storage is about where items are kept, not how data about them is captured; a purchase requisition is a purchasing document; and product layout refers to how equipment and workstations are arranged.
Question 2
Which technique for capacity control monitors planned and actual inputs and outputs of a work center, with planned inputs and outputs developed by CRP and approved by management?
Correct Answer:
Input/output control (I/O)
Explanation:
The technique being tested is about watching how a work center actually performs against what was planned, using a formal baseline developed through planning. In this approach, planned inputs and planned outputs are created by Capacity Requirements Planning (CRP) and then approved by management to establish the approved workload. On the shop floor, actual inputs and actual outputs are tracked, and variances between what was planned and what actually happened are monitored. This allows you to detect when a work center is over- or under-loaded and take timely corrective actions to keep capacity in balance. Infinite loading would ignore capacity limits and push schedules regardless of feasibility. CRP itself is the planning step that computes the required capacity and the planned inputs/outputs, but it doesn’t perform the ongoing monitoring of actual performance. Kanban governs material flow with a pull system and does not focus on monitoring capacity against a planned baseline.
Question 3
Which JIT philosophy describes level production throughout the supply chain to match the planned rate of end product sales?
Correct Answer:
Heijunka
Explanation:
Level production to match demand means smoothing the production schedule so output runs at a constant pace that aligns with the planned rate of sales. This idea is embodied in Heijunka, which aims to level both production volume and product mix across time and the supply chain. By producing at a steady rate and distributing work evenly, the system reduces inventory, avoids peak loads, and helps ensure a reliable flow that matches customer demand. Jidoka focuses on quality at the source and the ability to stop the line to fix defects. Kaizen is about ongoing improvement. Andon is the signaling system that alerts when problems occur. The described approach—steady, leveled production to match sales rate—best fits Heijunka.
Question 4
Which production planning approach keeps a stable output rate and adjusts inventory levels to meet demand?
Correct Answer:
Level production method
Explanation:
The main idea here is producing at a constant rate and using inventory as the buffer to meet varying demand. This approach, known as level production, keeps the output pace steady across the planning horizon. When demand rises or falls, production stays the same while inventory is built up or drawn down to absorb these differences. This stabilizes operations, reduces the need for changes in labor or setup, and smooths the schedule, though it may raise inventory carrying costs. This is why the level production method is the best fit: it explicitly aims to maintain a stable output rate and uses inventory levels to absorb demand fluctuations. The other concepts aren’t about keeping output constant while buffering with inventory; they involve prioritizing lead times, cost calculations, or different scheduling interpretations that don’t center on a fixed production rate.
Question 5
What is manufacturing lead time?
Correct Answer:
Manufacturing lead time
Explanation:
Manufacturing lead time is the total time inside the factory to convert raw materials into finished goods, starting when a production order is released and ending when the finished product is ready for inventory or the next step. It includes all internal steps such as setup, processing, assembly, inspection, and any waiting or material handling that occurs within the plant. It does not include time spent acquiring materials from suppliers (procurement lead time) or delivering the finished product to the customer (delivery lead time). For contrast, cycle time is the actual time to complete the processing of a unit through the operations, while procurement lead time and delivery lead time refer to external stages: obtaining materials from suppliers and shipping to customers, respectively.
Question 1
Exam overview

About this Exam

Prepare with the APICS Certified in Planning and Inventory Management (CPIM) Exam 1 Practice practice quiz. This question bank includes 10 questions covering planned, production, inputs, data, and outputs. Use it to review important concepts, identify knowledge gaps, and build confidence for the related exam, course, or assessment.

More details

Additional Information

APICS Certified in Planning and Inventory Management (CPIM) Exam 1 Practice

This practice set contains 10 questions from the matching question bank and focuses on planned, production, inputs, data, and outputs. Work through each question carefully, review the provided solutions, and revisit topics that need more study before your next attempt.

This is an independent study resource intended for practice and review; it is not an official examination or an endorsement by any organization named in the title.

Quiz information

Frequently Asked Questions

The complete question count is available after full access is unlocked.
No fixed duration is currently configured for this quiz.
Question explanations are included where they are available in the quiz content, helping you review the reasoning after answering.
Yes. You can retake the practice test again as you continue studying during your available access period.
After your access is confirmed, you can continue into the complete practice exam from this quiz flow.
Unless explicitly stated otherwise, this page provides independent practice material for study and exam preparation and is not the official examination itself.
Keep studying

Related Questions