Where a C-37 copper collector loop penetrates a composition roof, the 2018 UPC protection-of-piping rules plus FSEC weatherproofing require which detail?
Correct Answer:
A listed roof flashing or pitch pan, pipe insulation stopped short of the flashing so the joint stays dry, and no unsupported span at the penetration