When installing oak strip flooring over a 3/4 inch plywood sub-floor, what is the first action to take after cleaning the sub-floor?
Correct Answer:
Install the #15 asphalt coated paper
Explanation:
Standard installation procedures for hardwood strip flooring typically require a layer of #15 felt or asphalt-coated paper to act as a moisture retardant.