Under GS6 guidance, what formal permission and procedure are required before plant equipment can operate under or within the safe clearance zone of an active 132kV high-voltage power line?
Correct Answer:
Written permission / Permit to Work from the Electricity Distribution Network Operator (DNO), site risk assessment, and physical height limiters fitted to the machine