A excavation contractor is digging a continuous footing trench with a total perimeter length of 120 feet, a width of 2.0 feet, and a depth of 1.5 feet. If the excavated soil experiences a swell factor of 15%, what is the total volume of loose soil that must be hauled off-site in cubic yards?
Correct Answer:
15.33 cubic yards