A contractor wants to change a qualified SMAW pipe WPS from E7018 fill to a different F-number filler and to add postweld heat treatment that was not on the PQR. What is required?
Correct Answer:
Requalification of the procedure (a new PQR) because filler F-number and PWHT are essential variables