A contractor dewaters a wet utility trench on a CGP-covered park site into a nearby arroyo. What is the correct stormwater approach?
Correct Answer:
Treat dewatering as an authorized discharge only when it is controlled, filtered or settled as required by the CGP, and inspected on the CGP dewatering schedule