A C-21G crew finds a pair of 4-inch raised-face flanges 3/8 inch out of parallel. The correct way to close the joint is to:
Correct Answer:
Correct the pipe fit-up (cut, reweld, or add a spool) so the flanges meet square, then tighten the bolts evenly