A 1-hour steel-stud corridor partition has a single layer of 5/8-inch Type X each side and will be painted. Joints land on the studs. Must joints and fasteners be treated under IBC 2018 2508.5?
Correct Answer:
Yes. Steel-stud single-layer rated assemblies are not in the wood-framing exception, and paint is not a decorative finish equivalent to joint treatment