A T&P relief drain terminates 4 inches above grade with a threaded end and a trap in the run. Which UPC 2021 Section 608.5 corrections must the inspector require?
Correct Answer:
Terminate not less than 6 inches and not more than 2 feet above the ground or flood level, point down, with no trap and no threads on the outlet