A dry extended-detention pond on a GF-4 flood-control site is designed so that the post-development 10-year peak leaving the outlet is no greater than the pre-development 10-year peak. What is the contractor's most important construction implication?
Correct Answer:
The outlet structure, orifice, and emergency spillway must be built to the plan elevations and openings; field changes to "drain it faster" defeat the design