During a site inspection, a 15-gallon drum of hydraulic fluid is tipped over, and the entire contents spill onto a gravel staging area. The spill is quickly contained with absorbent materials. According to typical SWPPP requirements, what is the inspector's most important documentation responsibility?
Correct Answer:
Ensure the incident is recorded in the SWPPP's spill log with details on the substance, volume, location, and cleanup measures.