F60 Fireguard Test 26 Questions And Answers

EXAMS AND CERTIFICATIONS 26 Terms | F60 Fireguard Test 26 Questions And Answers
1 / 10
Terms in this set 26
For hot work operation with citywide permit, the owner of the premises of the hot work operation areas must be notified in writing by the citywide permit holder ______ the hot work is to be started.
at least 48 hours before
The pre-hot work check must be conducted by the responsible person before hot work is authorized and __________
least once per day.
The check reports must be kept at the work site during the work, made available for inspection by a representative of the FDNY, and maintained on the premises for a minimum of
48 hours after work is complete.
A pre-hot work check must be conducted at least
once per day
Hot work operations involving cutting or welding shall be conducted at least
35 feet from combustible materials and combustible waste
All other hot work operations shall be conducted at least
25 feet from combustible materials and combustible waste
Sprinkler system protection ____________while hot work is performed.
must not be shut off or impaired
When should a Fire watch be maintained
A fire watch must be maintained during any hot work operation.
What other duties should the Fire Watch have while on hot water operations.
The persons conducting a fire watch shall not have other duties.
Where hose lines are required, they shall be connected, charged and ready for operation
At least one portable fire extinguisher with a minimum 2-A:20-B:C